The work starts now....


We have now received the hull survey for Our Daddy and have been able to set out our plan of works.....
There were a couple of advisories on the survey which needed further inspection, one of which were the nails attaching the hull planks to the frames. As you can see from the picture there is some rust staining along her side, this is caused by the small wooden plug that was originally used to cap the nails, shrinking or having fallen out being replaced with filler, water seeps into the wood and starts to corrode the nails. It has a lovely name 'Nail Sick' so because of this we had to pull several nails to check in their condition, now that was a task and a half bearing in mind some of these had been there for close on a hundred years!!
New
Old

We have to say that the nails we have pulled are in very good condition, that is a relief as having to refasten her hull planks would have taken a fair old time, it is not just a case of whack a nail in it is far more time consuming than that! That was one question asked resolved the second was the condition of the Chain stay bolts, well we have removed a couple of these and they are also in good fettle, all in all very pleased.

So the tasks begin, first up is to remove and fair up the topsides and get them primed and sealed for the winter, fair and prime/antifoul the hull so as to seal it, then it will be onto the bulwark timbers, again this is fairing the timbers, priming and top coating to seal the timber....... there is a lot of fairing and finishing to be done!!

Well enough for today, next Monday we are taking down the topmast so that can be..... you guessed it, faired, painted but 6-10 coats of varnish this time!!

We will be posting up the sailing schedule in a couple of weeks time so keep your eye out on here and the websites for the interesting places to visit and sailing trips we will be offering in 2014.